Wind Turbines - Products and Pricing

The diverse range of Wind Turbine products we supply and install includes:

Wind Turbine guide prices

Perpetual Energy supplies, installs and operates individually sited wind turbines and wind farms. Below is a list of budgetary prices to install a single Wind Turbine for your project.

Also, contact us for details on how we can help to acquire site permissions and a full range of services to develop, finance and operate wind turbines and wind farms.

Summary

Turbine Size Tower Height Rotor Diameter Installed Cost £/kw
10kW 15m, 18m 13m £37,000 £3,700
20kW 15m, 18m 11m £60,000 £3,000
50kW 25m, 30m 19m £180,000 £3,000
100kW 30m, 37m 19m, 20m £320,000 £3,200
330kW 37-50m 33.4m £590,000 £1,787
1.25MW 65m, 68m, 91.5m 62m, 64m £1,400,000 £1,120
2MW 80m, 100m 80m £1,900,000 £950


*Installed cost includes:

  • Standard concrete pad foundation in accordance with manufacturers design
  • Trenching in light soil
  • 100 meters of SWA cable to connection point
  • Standard G83 / G59 Grid connection

*Excludes:

  • Delivery Ex Works.
  • Access costs - site modifications.
  • Mobilization.
  • Permitting costs (planning, grid).
  • Grid connection design if non-standard.
  • Additional cabling/trenching.
  • Foundation design if adverse ground conditions.
  • Communication costs if applicable.
  • Operations & Maintenance.

Table of proposed wind generation tariffs for first year of FITs (2010-2011):

Technology
Scale
Proposed Initial Tariff (p/kWh)
Annual Degression (%)
Wind
<1.5kW
30.5
4
Wind
1.5-15kW
23
3
Wind
15-50kW
20.5
3
Wind
50-250kW
18
0
Wind
250-500kW
16
0
Wind
500-5MW
4.5
0
Existing microgenerators transferred from RO
9
N/A
 

Source: department of Energy and Climate Change
 
Transitional arrangements:
Pre 15 July 2009 - all sub50kW units registered under RO will be transferred to FIT (9p/kWH).
All sub50kW units not registering under the RO as of 15 July 2009 will NOT be eligible for FITs.
Post 15 July 2009 but pre FIT implementation date - all units will be eligible for FIT tariff as if they were installed post FIT implementation. No retrospective reward for the interim period will be delivered over and above the 2ROCs currently available.
LCBP grants and other grant will NOT affect FIT eligibility.
       

 
<50kW
50kW-FIT Max
>FIT Max
Installations accredited under the RO before publication of the RES
Automatic transfer to FITs
Remain in the RO
Remain in the RO
Installations completed during the interim period
FITs from introduction
One-off choice of FITs or RO
Remain in the RO
Installation completed after FITs become operational
FITs
One-off choice of FITs or RO
Remain in the RO

 

Key
Stations that apply for accreditation under the RO during the interim period would be automatically transferred to FITs with a reduction in the lifetime of support.
Choice only possible until December 2010. Unless FIT option is explicitly taken generator will remain in the RO.

Source: department of Energy and Climate Change.